Offshore Wind Innovation – Renewable Power from the German Coast

By the end of 2019, Germany counted 25 fully operational offshore wind energy projects and the installed transmission capacity in the North Sea added up to more than 7 GW. The joint side event from the Association of German Offshore Wind Farm Operators (BWO) and TenneT will give an overview on existing projects and future developments providing insights both from a transmission system operator and offshore wind farm operators.

Programme:

09:00 am: Offshore Grid Connection Systems in the North Sea (TenneT)
09:30 am: Current Status of Offshore Wind in Germany (BWO)
10:00 am: Discussion

Following TenneT Virtual Vision Tour until 1 pm.

You can register under: info@bwo-offshorewind.de